You must obtain a sewer permit:

  • Anytime you are modifying an existing sewer line that is outside of the building.
  • If you are installing a new sewer line and connecting to sewer.

In addition, if you are changing the use of your building, additional sewer connection fees may be required. Please refer to the Connect to Sewer page for a copy of the sewer permit and for more information.