Prior to scheduling the conference, the Contractor must have:
- Liability insurance
- A copy of the 2020 Design Manual
- A Right of Way Utility permit, if required.
These must be satisfied or completed before the preconstruction conference can be scheduled.
During construction, the District inspects the mainline installation and oversees the testing of the sewer mains and manholes. Contractor must contact District to schedule testing.