Stutz Road Septic Elimination Project

Project Background

The District is committed to protecting water resources by providing public sewers to areas currently served by on-site septic systems.  Extending the sewer reduces long-term risks to the environment, allowing for the abandonment of septic systems that can fail over time.

Using an established set of criteria, the District evaluated individual Septic Elimination Project (SEP) areas and identified the highest-priority projects. The Stutz Road project rose to the top of the list.

The project will extend sewer service in the neighborhood by installing public sewer mains and public sewer laterals. Public sewer laterals will be extended to the property line, which may be located behind the curb, to minimize homeowner cost for private sewer lateral improvements.

Wallace Heights Septic Elimination Project
Wallace Heights Septic Elimination Project Area Map

If you would like to receive updates on the project, please sign up for project updates at the bottom of this website.

Schedule

The project is currently in preliminary engineering and design. Construction is dependent on funding awards. The District is hopeful for construction in 2028.

Wallace Heights schedule

Construction Impacts

Construction to install the sewer will use open-cut excavation methods, which consists of digging a trench, laying pipe, and backfilling. Public sewer mains will generally run parallel with roadways. Public sewer laterals will extend from the sewer main to the property line which may be located behind the curb. Photos from past projects are included below.

Construction Impacts trench digging
Construction impacts - open-cut excavation methods

Funding

The District is actively seeking and applying for funding to aid in lowering project costs and make the connection to sewer more accessible for residents. Current efforts are focused on funding at the federal level.

To supplement grant funding, the District will use system development charge revenue, which is collected from new development, to fund the remaining cost for the project.

Project Sign-Up

Sign up for project updates below:

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form

Stutz Road Septic Elimination Project

Project Background

The District is committed to protecting water resources by providing public sewers to areas currently served by on-site septic systems.  Extending the sewer reduces long-term risks to the environment, allowing for the abandonment of septic systems that can fail over time.

Using an established set of criteria, the District evaluated individual Septic Elimination Project (SEP) areas and identified the highest-priority projects. The Stutz Road project rose to the top of the list.

The project will extend sewer service in the neighborhood by installing public sewer mains and public sewer laterals. Public sewer laterals will be extended to the property line, which may be located behind the curb, to minimize homeowner cost for private sewer lateral improvements.

Wallace Heights Septic Elimination Project
Wallace Heights Septic Elimination Project Area Map

If you would like to receive updates on the project, please sign up for project updates at the bottom of this website.

Schedule

The project is currently in preliminary engineering and design. Construction is dependent on funding awards. The District is hopeful for construction in 2028.

Wallace Heights schedule

Construction Impacts

Construction to install the sewer will use open-cut excavation methods, which consists of digging a trench, laying pipe, and backfilling. Public sewer mains will generally run parallel with roadways. Public sewer laterals will extend from the sewer main to the property line which may be located behind the curb. Photos from past projects are included below.

Construction Impacts trench digging
Construction impacts - open-cut excavation methods

Funding

The District is actively seeking and applying for funding to aid in lowering project costs and make the connection to sewer more accessible for residents. Current efforts are focused on funding at the federal level.

To supplement grant funding, the District will use system development charge revenue, which is collected from new development, to fund the remaining cost for the project.

Project Sign-Up

Sign up for project updates below:

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form